Jira reports for analysts: burndown, velocity and the cumulative flow diagram
Read the three main Jira reports, say in plain words what each one shows, and spot the signs that a requirement is stuck or the scope is growing.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: a fuel gauge, a trip log, and a clear pipe. The gauge shows fuel left against the trip. The log shows how far you drove each day. The pipe shows where water piles up before a narrow part.
The gauge is the burndown. The log is the . The pipe is the . Sam, an analyst at Daily List, a to-do list app, reads all three before he talks to Nina.
What it is: Jira is the website where the team tracks work items. A report is a chart of that work over time. The board is the neighbour. The board shows which column an item sits in today. These three charts show the pattern across days. They are not a roadmap.
Why it matters: On day six the work-left line sits above the grey guideline. Sam tells Nina the same day, because two stories are waiting on her. She does not hear it first at the demo.
PLAIN WORDS · 2 in this section
- burndown
- a line that shows how much work is left
- jira
- a tool that teams use to track work
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB A petrol gauge, a trip log and a water-pipe view.
- Gauge
- Log
- Pipe
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| The gauge against the trip | The sprint burndown |
| The trip log | The velocity chart |
| The clear pipe | The cumulative flow diagram |
| Water piling up | Possible congestion to investigate |
WHERE THIS PICTURE STOPS
- A gauge measures fuel; story points are relative estimates and the chart also depends on scope and tracking settings.
- A trip log is one car, but velocity differs between teams.
- A pipe shows one flow, but a board has many columns.
HOOK
Gauge, log, pipe.
TELL A FRIEND
A gauge, a trip log and a pipe.
OFTEN MIXED UP WITH Jira for analysts: epics, stories and a backlog you can groom. That topic builds the backlog. This one reads the reports that show how the work is going.
Sources & standards — 2 sources
- Implementation-specific
View and understand the burndown chart ↗ — Atlassian · Estimation/tracking configuration, scope changes; companion sprint-burndown event log and cumulative flow report. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated
Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.
- Implementation-specific
What are story points? ↗ — Atlassian · Default Story/Epic field contexts; relative estimation; companion enable-estimation and use-your-scrum-backlog pages; team-managed settings. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated
Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.
PRACTISE AND KEEP
Sources for this topic — 5 sources
- Implementation-specific
View and understand the burndown chart ↗ — Atlassian · Estimation/tracking configuration, scope changes; companion sprint-burndown event log and cumulative flow report. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated
Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.
- Implementation-specific
What are story points? ↗ — Atlassian · Default Story/Epic field contexts; relative estimation; companion enable-estimation and use-your-scrum-backlog pages; team-managed settings. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated
Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.
- Implementation-specificJIRA Software 7.3 documentation; created in 2017
Documentation for JIRA Software 7.3 — original Cumulative Flow Diagram and selected explanation ↗ — Atlassian · Documentation for JIRA Software 7.3, physical pages 283–285: complete original cumulative-flow screenshot embedded on page 284, chart explanation, board saved filter and column mapping. Actual selected PDF pages read 7 November 2026; historical 2014–2015 sample, not current Jira Cloud navigation or Daily List data.
Actual official PDF and selected complete pages read 7 November 2026. PDF SHA256 90c0897d1b74ad370a6a973ca6dd1f705e657c5262a6587415563b4d12a596c1. Complete 1278×1108 raster losslessly extracted from page 284, SHA256 312d2ce6314090f0127a0d72bc73aee25ce4cef12784d535346a7c155333660f; opaque soft mask. Page 284 explicitly credits Atlassian 2017 and CC BY 2.5 Australia. PDF layout clips the right of the picture but its embedded original contains the complete figure. No raster changes, crop, redraw or current-attachment RGB transfer. Screenshot release unspecified. Remaining manual sections not certified.
- Implementation-specificCC BY 2.5 Australia
Creative Commons Attribution 2.5 Australia — selected reuse conditions for Atlassian’s licensed 2017 original ↗ — Creative Commons · CC BY 2.5 Australia legal code, selected sections 1, 3, 4, 5 and 7; original author/title/source/licence and disclaimer retained. Atlassian’s 2017 page 284 explicitly applies this licence to the original illustrated work; no Cloud-to-Data-Center licence transfer.
Actual selected sections 1, 3, 4, 5 and 7 read 7 November 2026. Preserve Atlassian author, Cumulative Flow Diagram title, 2017 credit, publisher PDF and licence URI, and disclaimer. Original static asset remains publicly accessible with source notice; lesson access controls do not add restrictions to the licensed image. No endorsement, blanket Atlassian screenshot grant or transfer from Cloud metadata inferred.
- Implementation-specificJIRA Software 7.3 documentation; created in 2017
Documentation for JIRA Software 7.3 — original Burndown Chart and selected explanation ↗ — Atlassian · Documentation for JIRA Software 7.3, physical pages 274–276; actual complete page 275 screenshot and explanation reviewed 8 November 2026. Original source RGB and declared alpha retained. Source event table visibly contains only sprint-start rows; interpret scope through the actual event log, not inferred causes. Historical 2015 sample and 2017 manual, separate from current Cloud/Daily List.
Actual preserved official PDF selected pages read 8 November 2026. PDF SHA256 90c0897d1b74ad370a6a973ca6dd1f705e657c5262a6587415563b4d12a596c1. Native 1143×890 original extracted from image xref 3775 with its declared soft mask 3774, preserving source alpha; selected PNG SHA256 55c678440662d62f77ddd70898299b22cc25fe7de7d87007f6458a1a9853bbeb. Page 275 explicitly credits Atlassian 2017 and CC BY 2.5 Australia. The original source visible event table contains sprint-start rows only: no specific spike/drop cause is proven from this static image alone. Screenshot release unspecified. Remaining manual sections not certified; no grant transferred to unrelated current Cloud images.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.