TOPIC 09/2015 MINNOT STARTED

draw.io process shapes and swimlanes: pool, lane, task, gateway, start and end

Draw a process in draw.io with a pool and lanes, tasks, one gateway, and start and end events, using only a small beginner set of shapes.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: a swimming pool with lane ropes. Each person stays in a lane. A swimmer may turn and take another path. Everyone starts at one edge and finishes at a wall.

A pool represents a participant; it can contain that participant’s process or be a black box. Each lane is a role. A turn is a gateway. The edges are the start and the end. Sam, an analyst at Daily List, a to-do list app, draws the reminder flow with Nina.

What it is: , also called diagrams.net, is the free diagram editor in the browser or on your desktop. This slice is a small in BPMN. BPMN means Business Process Model and Notation, a shared set of shapes. A plain flowchart diamond is the neighbour. It can also use swimlanes to show ownership, but it does not by itself supply all BPMN semantics.

Why it matters: A paragraph hides who acts, and where the path splits. Sam and Nina can point at the gateway before Leo builds the wrong branch.

PLAIN WORDS · 2 in this section
flowchart
a drawing of steps in time order
swimlanes
bands in a process drawing, one per person or group

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB A swimming pool with lane ropes.

  1. Lane
  2. Turn
  3. Wall
Pool

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
A laneA role in the process
A turn at the wallA gateway
The starting edgeThe start event
The finishing wallThe end event

WHERE THIS PICTURE STOPS

  • A swimmer is one person, but a lane may be a team.
  • A pool race has no choices, but a gateway splits paths.
  • A lane rope is fixed, but a lane can be moved in the tool.
  • A swimming-pool wall does not represent the clock-marked intermediate timer wait.

HOOK

Lane, turn, wall.

TELL A FRIEND

Lanes, a turn and walls.

OFTEN MIXED UP WITH draw.io from zero: a process diagram with swimlanes you can share. That topic draws a first simple diagram. This one adds pools, lanes, a gateway and events.

Sources & standards — 2 sources
  1. Official requirement

    Business Process Model and Notation 2.0.2 ↗ — Object Management Group · Participants/pools and lanes; sequence/message flows; exclusive/parallel gateways; §10.5.2–10.5.3 optional start/end events and conditional pairing. OMG BPMN 2.0.2, January 2014 (formal/2013-12-09)

    Participants/pools and lanes; sequence/message flows; exclusive/parallel gateways; §10.5.2–10.5.3 optional start/end events and conditional pairing · Checked 2026-11-06

    OMG BPMN 2.0.2, January 2014 (formal/2013-12-09). Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.

  2. Implementation-specific

    Export a diagram to a PDF file ↗ — draw.io · Include a copy of my diagram; Safari/Desktop/self-hosted export differences; companion export-diagram formats. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated

    Include a copy of my diagram; Safari/Desktop/self-hosted export differences; companion export-diagram formats · Checked 2026-11-06

    Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.

PRACTISE AND KEEP

Sources for this topic — 3 sources
  1. Official requirement

    Business Process Model and Notation 2.0.2 ↗ — Object Management Group · Participants/pools and lanes; sequence/message flows; exclusive/parallel gateways; §10.5.2–10.5.3 optional start/end events and conditional pairing. OMG BPMN 2.0.2, January 2014 (formal/2013-12-09)

    Participants/pools and lanes; sequence/message flows; exclusive/parallel gateways; §10.5.2–10.5.3 optional start/end events and conditional pairing · Checked 2026-11-06

    OMG BPMN 2.0.2, January 2014 (formal/2013-12-09). Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.

  2. Implementation-specific

    Export a diagram to a PDF file ↗ — draw.io · Include a copy of my diagram; Safari/Desktop/self-hosted export differences; companion export-diagram formats. Living product documentation; accessed 2026-11-06; no fixed release/effective date stated

    Include a copy of my diagram; Safari/Desktop/self-hosted export differences; companion export-diagram formats · Checked 2026-11-06

    Living product documentation; accessed 2026-11-06; no fixed release/effective date stated. Reviewed for the BA Tools complete-domain audit. Source-based teaching paraphrases product guidance; Daily List examples are synthetic and do not claim execution in a licensed vendor workspace. Public documentation access does not imply permission to redistribute its images.

  3. Official requirement

    BPMN 2.0.2: normal-flow timer events and lane notation ↗ — Object Management Group · BPMN 2.0.2 (formal/2013-12-09), printed p.250 (PDF p.280): normal-flow intermediate timer delay and clock marker; Figure 10.96, printed p.273 (PDF p.303): timer variants; Figures 10.123–10.124, printed p.305 (PDF p.335): lanes inside a pool. Normative PDF inspected 2026-11-06.

    Normal-flow intermediate catching timer as a delay, clock marker and double thin solid circle; distinguish start, boundary and intermediate variants. Lanes partition a pool. Source: printed p.250 and Figures 10.96 (p.273), 10.123–10.124 (p.305). · Checked 2026-11-06

    Normative BPMN 2.0.2 PDF, formal/2013-12-09; version page January 2014. Relevant text and actual source figures inspected, including all four timer variants. The Daily List process is an independent synthetic teaching case, not a reproduction of an OMG figure or a verified executable model. Public access does not imply a publisher-art redistribution licence.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.