Context diagrams and scope
A context diagram puts the system in one box and shows who and what it talks to. Learn to draw one, read it, and use it to agree what is in scope and what is out.
L1–L4 are part of the Pro pass
L0 Explain simply
Analogy: The plot plan of a house. A drawing of your house plot shows the road, the neighbours and the gate. It shows what is yours and what is not. You can see where the gate lets people in.
Sam is a , the person who finds out what people need. Sam works on Daily List, a to-do list app. The team keeps arguing about what the new project covers. Nina, the who decides what the team builds, thinks it covers calendars. Leo, the developer, thinks it does not.
So Sam draws a , a one-picture view of a system in the middle and everything it talks to around it. Daily List sits in one box. Around it stand Lily, the calendar service and the email service. Each line says what passes between them:
Lily → Daily List: new task. Daily List → Lily: task list. Daily List → email service: reminder text. Daily List ↔ calendar service: due dates.
The box is closed. Sam does not draw the database or the screens inside it. The picture shows the edge of the system and nothing more.
Now the argument has a place to land. Scope is what is in the work and what is left out. The calendar line makes the interaction visible. Nina must separately decide whether changing it is in this project’s scope; its presence is not approval. The team also names what is , which means clearly named things the work will not do. Paying for a plan is on the list.
A plot is fixed by law. A project scope can move, so write down when it changes.
PICTURE IT
The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.
THE REAL JOB A shows a chosen system and its interactions, while a separate scope record states the approved, excluded or undecided changes.
- Name the system
- List outside parties
- Draw labelled lines
- Ask what is missing
- Write what is out
HOW THE PICTURE MAPS
| In the picture | In the work |
|---|---|
| The house plot plan | The context diagram |
| The house in the middle | The system in one box |
| The road, the neighbours and the gate | The outside parties and the lines |
| The plot boundary | The chosen system boundary, distinct from project scope |
| A list of things the owner will not build | The out-of-scope list |
WHERE THIS PICTURE STOPS
- A plot is fixed by law. A project scope can be moved by a decision.
- A plot plan shows land. A context diagram shows what passes along each line.
- A plot plan never lists what the owner will not build. An out-of-scope list does.
HOOK
One box, its lines, and a list of no.
REMEMBER IT THIS WAY
A chunk: a long list grouped so it is easier to hold.
One box in the middle, lines to the outside, and a list of what is out. The gate shows where people come in.
| In the trick | What it stands for |
|---|---|
| Box | Daily List in one box |
| Lines | labelled lines to outside parties |
| Out list | what is not in the work |
TELL A FRIEND
The shows the system and its outside interactions, including interfaces this project may leave unchanged. Record project decisions separately.
OFTEN MIXED UP WITH Why we draw models. That topic says why any picture is a model. This one is a particular model that shows the edge of a system.
PRACTISE AND KEEP
Sources for this topic — 3 sources
- Market practice
CPRE Requirements Modeling syllabus 3.1.1,30 July 2024 ↗ — International Requirements Engineering Board · Requirements Modeling syllabus 3.1.1,30 July 2024, §§1–5 including4.8: purposeful views, information structures, functional/behavioural modelling, decomposition and scenarios; public PDF opened/read2026-11-06.
Primary public document opened and the cited material read on2026-11-06. Original educational paraphrase; no source figure copied. §§1–5: model purpose, information structures, functions, behaviour, decomposition and scenarios. Educational objectives, not mandatory product artefacts.
- Market practice
IIBA Global Business Analysis Core Standard, BABOK Guide version 3 companion (2017) ↗ — International Institute of Business Analysis · IIBA Global Business Analysis Core Standard,2017 BABOK Guidev 3 companion: strategy/current/future state and requirements analysis/design definition; public abridgement opened/read2026-11-06. Not Business Analysis Standardv2.0.
Relevant public sections reviewed 6 November 2026 for V11 BA agile/product. See applicability for exact version, scope and access limitations.
- Simplified educational illustration
Payments Signal editorial teaching models — Payments Signal
What this simplifies: The Daily List app and its people are invented for teaching. A real context diagram can follow a strict notation from structured analysis. This lesson uses plain lines of text.
Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.
Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.