TOPIC 17/1820 MINNOT STARTED

The SDLC and its models: phases, waterfall, V-model, iterative, spiral, agile and DevOps, and where the analyst works

Learn the software development life cycle: its seven phases, what each one produces, how six models order them, and where the business analyst works in each.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: Building a house. A family wants a new house, and the job has to go in a clear order. First they decide if they can afford to build. Then they say what they need, such as three bedrooms. An architect draws the plans. Builders build. An inspector checks the work. The family gets the keys. Later, someone fixes a leaking tap.

Software goes through the same steps. The path from the first idea to the day the software is retired is the , or SDLC. A phase is one stage on that path. Each phase hands something to the next, such as a plan or a working screen.

Sam is the at Daily List, a to-do list app. A BA is the person who finds out what people need and writes it down clearly. Nina, the who decides what the team builds next, wants a new feature: sharing a list with a friend.

Sam asks one : do we do the phases once, in order, or in small rounds? The answer is a , a named way of ordering and repeating the phases. The V-model pairs each building phase with a checking phase. The spiral model repeats the phases in loops, and each loop starts by asking what could go wrong.

Waterfall is another life cycle model. Agile is a set of values and principles. DevOps brings development and operations together. These ideas shape how teams work; they are not the same kind of phase diagram. Later levels explain each one. All of them use the same jobs. They differ in the order and in how often a job comes round.

The picture has a limit. A house is hard to change once it is built. Software can be changed after release, so the phases keep coming round.

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB Remember the jobs of the and see that a model only changes their order and how often they repeat.

  1. Plan
  2. Find needs
  3. Design
  4. Build
  5. Test
  6. Release
  7. Look after
The jobs that every model uses

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
Deciding whether to build the housePlanning
Saying what the family needsRequirements
The architect's plansDesign
Builders buildingBuild
The inspector's visitTesting
Handing over the keysDeployment
Fixing the leaking tap laterMaintenance

WHERE THIS PICTURE STOPS

  • A house is hard to change once built. Software can change after release.
  • A house is built once. Software keeps coming round the same phases.
  • A house has one owner. A product has many users with different needs.
  • Deployment puts a version into an environment; release makes capability available to users. Agile values, Scrum and DevOps are not interchangeable lifecycle models.

HOOK

Same jobs, different order.

REMEMBER IT THIS WAY

A sequence: the real steps, in order.

Seven jobs in a simple teaching order, which can overlap or repeat: decide, say what is needed, design, build, inspect, hand over, fix later.

What each part of the trick stands for
In the trickWhat it stands for
Deciding whether to build the housePlanning
Saying what the family needsRequirements
Architect's plansDesign
Builders buildingBuild
Inspector's visitTesting

TELL A FRIEND

The (SDLC) is the path software follows, from plan to care. A model only changes the order of the jobs, and the analyst works in a different place in each.

OFTEN MIXED UP WITH Waterfall, agile or hybrid: choosing a way of working. That lesson gives the questions for choosing between predictive, adaptive and hybrid ways of working. This lesson names the phases and compares lifecycle models with agile approaches and DevOps practices, including the V-model and the spiral.

PRACTISE AND KEEP

Sources for this topic — 15 sources
  1. Market practice

    What is the software development life cycle (SDLC)? ↗ — IBM · An overview names seven phases with a usual output for each: planning gives a project plan, analysis gives requirement documents, design gives a design document, implementation gives working code, testing gives refined software, deployment gives software for users and maintenance gives fixes (search excerpt, page not opened)

    Vendor overview of seven SDLC phases with a usual output for each. Phase lists differ between guides. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  2. Market practice

    Managing the Development of Large Software Systems (Royce, 1970) ↗ — Winston W. Royce, in Proceedings of IEEE WESCON · Royce's 1970 paper is widely credited as the source of the waterfall picture; secondary pages say he called the single-pass version risky and said it invites failure, and that he advised passing through the steps at least twice (search excerpt of secondary pages, scanned paper not opened)

    Origin of the waterfall picture. Only secondary pages were read: they say Royce called the single-pass version risky and advised going through the steps more than once. The scanned paper was not opened. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: 1970 paper; scanned copy listed by a search. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  3. Market practice

    A spiral model of software development and enhancement (Boehm, 1988) ↗ — Barry W. Boehm, Computer 21(5), IEEE · Boehm, A spiral model of software development and enhancement, Computer 21(5), 1988: a risk-driven process where the project repeats cycles, and risk decides what to do next (search excerpt, page not opened)

    Describes the spiral as a risk-driven process model that repeats in cycles. A 1986 paper with a similar title is also named by some pages. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: 1988, volume 21, issue 5, pages 61 to 72. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  4. Market practice

    V-Model: The Verification and Validation Lifecycle Explained (Rework) ↗ — Rework · The V-model pairs requirements with acceptance testing, system design with system testing, detailed design with integration testing and coding with unit testing; the exact pairings vary by source (search excerpt, page not opened)

    Vendor guide that pairs each development phase with a test level and notes that problems from early phases can stay hidden until the test side of the V. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number; read as a search excerpt only. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  5. Market practice

    Manifesto for Agile Software Development ↗ — Agile Manifesto authors · The Agile Manifesto was written in February 2001 and states four values, including responding to change over following a plan; the items on the right still have value (search excerpt, page not opened)

    Manifesto for Agile Software Development, 2001; complete four value pairs and right-hand value qualification opened; companion https://agilemanifesto.org/principles.html complete twelve principles opened. Working software is primary, not sole, progress measure; change and documentation not mutually exclusive. · Checked 2026-11-06

    Relevant public sections reviewed 6 November 2026 for V11 BA agile/product. See applicability for exact version, scope and access limitations.

  6. Market practice

    The Scrum Guide — The Definitive Guide to Scrum: The Rules of the Game (November 2020) ↗ — Ken Schwaber and Jeff Sutherland · The Scrum Guide 2020 describes Scrum as a frame of short rounds called sprints, each one month or less (search excerpt, page not opened)

    The framework definition itself: three accountabilities, five events, three artifacts with their commitments, and the five Scrum values. Thirteen pages, about 3,956 words, CC BY-SA 4.0.

    Used here for the agile-delivery questions a Payments Business Analyst, a Payment Quality Assurance Analyst and a Payments Product Manager are asked — and, as often, for what the Guide does not say. Additional actual read scope7November2026: Official Scrum Guide November2020, actual ProductBacklog/refinement, SprintPlanning and SprintReview sections read7November2026: emergent ordered work, ongoing refinement, Done-within-Sprint readiness, possible planning refinement, Developer sizing/selection and feedback. No mandatory1–2Sprint buffer, user-story format or universal all-questions-answered rule; no whole-guide read claimed in this pass. · Checked 2026-08-18

    Still current in August 2026. There is no 2025 or 2026 revision of the Guide.

    The confusable document is a rename. "Scrum Guide Expansion Pack" (v2025.6) became "Scrum Guide Expanded" (v2026.1, 18 January 2026), published at scrumexpansion.org by Jocham, Coleman and Sutherland. Same URL path, different name, and Jeff Sutherland co-authors both it and the Guide — which is exactly the hook that makes wrong credit plausible. It is not a version of the Scrum Guide.

    Nine terms interview answers routinely attribute to Scrum appear zero times in the Guide: story points, velocity, Definition of Ready, sprint zero, user stories, acceptance criteria, grooming, T-shirt sizing, planning poker. So do "estimate" and "estimation".

    Two that are usually said to be absent and are present, which is why this paragraph exists: burn-down charts are named once and subordinated — "Various practices exist to forecast progress, like burn-downs, burn-ups, or cumulative flows. While proven useful, these do not replace the importance of empiricism" — and backlog refinement is defined as "an ongoing activity". What is absent is refinement as an event, and the absent word is "grooming".

    The Guide does require Product Backlog items to acquire a size, and puts sizing on the Developers, while naming no unit, scale or technique. It says "accountabilities", not "roles"; five events, not four; never "ceremony".

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read in full from three independent mirrors that agree byte-for-byte on section structure, on the CC BY-SA 4.0 footer, on word count to within four words, and on all sixteen term-frequency counts above. Edition confirmed as 2020 specifically by zero occurrences of "Development Team" and thirteen of "Product Goal". Actual selected sections above read; prior metadata and wider source-use notes preserved. No full member book or adjacent legacy scheduling rule is implied.

  7. Market practice

    What is continuous delivery? ↗ — IBM · Continuous delivery keeps code in a state that can always be released, using an automated pipeline; it builds on continuous integration, and the release step stays a choice (search excerpt, page not opened)

    Vendor overview: continuous delivery keeps code ready to release through an automated pipeline and builds on continuous integration. Practitioner guidance. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  8. Market practice

    DORA's software delivery metrics: the four keys (dora.dev guide) ↗ — DevOps Research and Assessment (DORA) (Google Cloud) · DORA names four software delivery measures: lead time for changes, deployment frequency, change failure rate and time to recover from a failed deployment (search excerpt, page not opened)

    Defines change lead time, deployment frequency, failed deployment recovery time and change fail rate. Practitioner guidance, not a standard. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Web page, no edition number. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  9. Market practice

    NIST Special Publication 800-218, Secure Software Development Framework (SSDF) Version 1.1 ↗ — National Institute of Standards and Technology · NIST SP 800-218, the Secure Software Development Framework version 1.1, is a set of secure development practices that can be added to any life cycle model; it names four groups of practices (search excerpt, page not opened)

    Secure development practices that can be added to any life cycle model; four practice groups. The draft revision is not final. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Version 1.1, February 2022; a Revision 1 draft (version 1.2) was released in December 2025. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

    V34 review, 6 November 2026: Actual SSDF1.1 officialPDF§2 four practice groups and limits of notional examples read; current NIST publications listing marks1.1 final and revision1/version1.2 Draft17December2025.

  10. Market practice

    ISO/IEC/IEEE 12207: Systems and software engineering, Software life cycle processes ↗ — International Organization for Standardization, International Electrotechnical Commission and IEEE · ISO/IEC/IEEE 12207, Systems and software engineering, Software life cycle processes: named here only; the standard text is not quoted (search excerpt of a catalogue page, page not opened)

    Named only. Catalogue listing; the paid text was not read and is not quoted or paraphrased. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: A 2026 edition is listed by the catalogue; the 2017 edition is superseded. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  11. Market practice

    ISTQB Certified Tester Foundation Level Syllabus v4.0.1 ↗ — International Software Testing Qualifications Board · Section 2.1.1: the software development life cycle affects testing, with sequential, iterative, incremental and agile models each needing a different approach, and section 2.1.4 covers DevOps (confirmed against the syllabus, read in full text from a mirror copy of the publisher PDF, v4.0.1, 15 September 2024)

    The examinable statement of what a foundation-level tester is expected to know: six chapters, 64 learning objectives, each tagged K1 Remember, K2 Understand or K3 Apply, plus the test-design techniques the qualification names and groups as black-box, white-box and experience-based.

    Used here for the test-craft questions a Payment Quality Assurance Analyst and a Production Support Analyst are asked. It is cited for what the syllabus says a tester must be able to do, never as a rule about how payments work. · Checked 2026-11-07

    v4.0.1 is dated 15 September 2024 and is a list of corrections to v4.0 (21 April 2023) that reworded six learning objectives — not a cosmetic reissue. 78 pages.

    Two traps this entry exists to stop. v4.0.2 is the German edition (1 March 2025, 94 pages), so sorting by version number reaches the wrong document. And the widely-repeated per-chapter question allocation "8 / 5 / 4 / 11 / 9 / 3" is wrong: it is 8 / 6 / 4 / 11 / 9 / 2, derived from three official sample-exam answer keys and confirmed against the Exam Structure Tables.

    The single most consequential detail for a question bank: white-box coverage — statement and branch — is K2 "Explain", not K3 "Apply" (FL-4.3.1, FL-4.3.2, FL-4.3.3), and MC/DC, path and condition coverage are declared out of scope in §4.3. A question asking a candidate to compute branch coverage is testing something this syllabus does not.

    Read through a mirror, because the publisher's own domain could not be fetched (a reachability gap, not a statement about the publisher). A 403 there is a policy refusal and says nothing about whether the document exists or is reachable elsewhere.

    Anyone on an unrestricted network should open the canonical URL above and confirm the section and page numbers cited against it. Every claim drawn from this entry is written so that it can be checked against a numbered page.

    Read from two independent PDF-to-markdown conversions mirrored on raw.githubusercontent.com. They are treated as faithful because they were produced by unrelated parties with different tooling, agree on the full 64-item objective set including wording, and reproduce the same internal inconsistency present in the source PDF. Chapter 1 reads "testware that supports" where Appendix B reads "that support". A conversion artefact does not replicate across two toolchains.

    The licence permits attributed non-commercial extracts and use as the basis for articles. Whether a site that sells a pass may rely on that is an owner's decision, not this entry's.

    7 November 2026 review: actual publisher PDF 4.0.1, 15 September 2024, 78 pages, front matter/copyright and relevant numbered operative sections 0.5–0.10 and chapters 1–6 compared with CTFLpractice lessons. Earlier mirror/search descriptions are historical access records. TheK2 white-box objectives require explanation; the source does not justify a categorical ban on small numeric illustrations that support explanation. Later Exam Rules 1.2§4.1.4 usesK2 for keyword definitions, while syllabus§0.5 usesK1; keep dated scopes distinct. No copied questions or figure assets.

  12. Market practice

    BA role in agile (guide from a business analysis chapter) ↗ — South Florida chapter of a business analysis institute · A business analysis chapter guide says the analyst in waterfall gathers requirements up front, and in agile writes, refines and ranks stories and criteria (search excerpt, page not opened)

    Chapter guide: the analyst in waterfall gathers requirements up front; in agile writes, refines and ranks stories. The DevOps role could not be confirmed. Search excerpt only. · Checked 2026-10-18

    Found through a web search; the page was not opened (search excerpt, page not opened). Version: Undated PDF. Licence terms were not read, so put it in your own words and do not quote it. Open the page and confirm what it says before relying on any detail.

  13. Market practice

    DORA software delivery performance metrics — five-metric guide ↗ — DevOps Research and Assessment · Current DORA guide, opened2026-11-05: five delivery measures, distinct from historical four-key model.

    CurrentDORAsoftwaredeliveryguideopened6Nov2026,ThroughputandInstabilityread:currentFIVEchangeleadtime,deploymentfrequency,faileddeploymentrecoverytime,changefailrate,deploymentreworkrate. Historicalfournotcurrentfive. Notallteam/productmetricsDORA; useexistingtechnicalneighbourinsteadduplicatefullmetricslesson. · Checked 2026-11-06

    Relevant public sections reviewed 6 November 2026 for V11 BA agile/product. See applicability for exact version, scope and access limitations.

  14. Market practice

    The Kanban Guide — May 2025 ↗ — Kanban Guides contributors · The Kanban Guide, May 2025, opened2026-11-05; managing workflow and work in progress does not require Sprint iterations.

    The Kanban Guide,1May2025, version2025.5/current indicator; Definition, three Practices, Definition of Workflow six minimum elements, active management, FlowMetrics opened/read. Four measures WIP/throughput/work-itemage/cycletime; SLE probability+elapsedtime and stated start/finish. Open GuideJuly2025 is separate adaptation, not substitute. No compulsory visual layout or prohibition on Scrum cadence. · Checked 2026-11-06

    Relevant public sections reviewed 6 November 2026 for V11 BA agile/product. See applicability for exact version, scope and access limitations.

  15. Market practiceCMU/SEI-2000-SR-008, July2000

    Spiral Development: Experience, Principles, and Refinements (Boehm; edited Hansen) ↗ — Software Engineering Institute, Carnegie Mellon University · July 2000SEIauthor report, selected initial text/diagram labels0–213checked7 November 2026. Cycle starts with objectives/alternatives/constraints before risk evaluation; not a fresh read of the 1988 paper.

    Primary author follow-up for the spiral cycle: objectives/alternatives/constraints, risk evaluation, development/verification and planning the next cycle. This supports a limited historical model correction, not a mandated delivery method. · Checked 2026-11-07

    Normal web PDF opened7November2026; returned front/initial body and diagram text lines0–213read. Later-section fetches timed out; not a whole-report read. Original1988paper was not freshly opened. No diagram copied; external reproduction permission not established.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.