TOPIC 19/3615 MINNOT STARTED

Drafting requirements, user stories and acceptance criteria with AI

Draft requirements, stories and Given-When-Then criteria with an AI tool from checked notes. Keep a source line on each, delete extras and write the why yourself.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: A junior who drafts the form. A completed form can still contain wrong facts or ask the wrong question. A reviewer checks both why the form is needed and what its boxes actually say. A blank or a question can be more honest than invented certainty.

An (AI) tool may draft, ask questions, refuse or use supplied context. It does not inevitably fill every box. A polished draft still needs appropriate checks before being treated as an approved requirement.

Daily List is a fictional training app (SYNTHETIC / TRAINING ONLY). Lily says "Remind me nicely." state what must be true to accept a piece of work. The story describes eight generated criteria, three removed. Those are invented outcomes, not recorded calls or proof of a general drafting error rate.

A identifies a drafted item's basis or justification. An falsely presents an unsupported addition as established. A clearly labelled proposal can be useful without pretending it was elicited. A draft quality gate records the agreed checks and remaining gaps before a particular use.

The picture has a limit. A source may support a proposal, inference or question rather than a final requirement. A complete-looking form and one source reference are not proof of correctness or approval.

PLAIN WORDS · 3 in this section
unsupported
not backed by evidence, or not handled by software
inference
a conclusion reached from clues or evidence
correctness
being free of mistakes

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB The picture helps distinguish a filled template from a supported requirement or a proposal awaiting a decision.

  1. Start from checked notes
  2. Draft with a source line
  3. Ask the INVEST questions
  4. Resolve unsupported criteria and proposals
  5. Pass the quality gate
From notes to a checked backlog item

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
The junior filling in the formThe artificial intelligence (AI) tool drafting requirements
The notes you hand overChecked notes and agreed rules
A note saying where each answer came fromThe source line
A box filled with something nobody asked forThe invented criterion
The senior checking the form before it goes outThe draft quality gate

WHERE THIS PICTURE STOPS

  • A tool may ask a question or leave a gap, but can also fill one with an unsupported detail.
  • A tool may use supplied or retained context; check the actual sources and their versions.
  • A form has fixed boxes, while a backlog item can take the form the team agrees.

HOOK

Trace the draft, review proposals, keep decisions explicit.

REMEMBER IT THIS WAY

A chunk: a long list grouped so it is easier to hold.

Test each story with : independent, negotiable, valuable, estimable, small, testable.

What each part of the trick stands for
In the trickWhat it stands for
Iindependent
Nnegotiable
Vvaluable
Eestimable
Ssmall
Ttestable

INVEST prompts useful story-quality questions but does not establish that a criterion is supported, current or approved.

TELL A FRIEND

Draft from current checked sources and trace important claims. Use as review questions, not automatic approval; remove unsupported facts or keep explicit proposals for the right decision makers.

OFTEN MIXED UP WITH Prompt patterns and review checklists for analysts. That topic has a draft examples pattern. This one is the full drafting routine for requirements, stories and criteria.

Sources & standards — 3 sources
  1. Regulatory guidance

    NIST AI 600-1, Generative Artificial Intelligence Profile ↗ — National Institute of Standards and Technology · Selected complete NIST AI 600-1 risk sections read: unsupported claims, overreliance, privacy and information integrity. No transcript, summary or generated-review accuracy rate certified.

    Business Analysis Academy, AI for analysts: only the exact selected evidence scope stated in notes; not binding global product requirements or validation of fictional examples. · Checked 2026-11-07

    July 2024. Actual read scope: Cover/intro; complete sections 2.2, 2.4, 2.6, 2.7, 2.8; selected action snippets only, not full section 3. Limits: No whole-document review or figure reuse claimed. No figure copied or integrated.

  2. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · Existing canonical IIBA Standard record reused unchanged. Own selected public HTML sections 4.3/4.4 and landing overview read 7 November 2026: requirements/designs, classification and traceability. No own PDF edition or full BABOK 50-technique claim.

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

  3. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Junior-form analogy, Daily List, Lily Remind-me-nicely, eight criteria/three removed, text-message proposal and timely-versus-one-hour contrast are fictional. No supplied note3, user-set-time rule, live model output or approved additional criterion invented.

    This site's own simplified teaching models. · Checked 2026-07-12

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

PRACTISE AND KEEP

Sources for this topic — 7 sources
  1. Regulatory guidance

    NIST AI 600-1, Generative Artificial Intelligence Profile ↗ — National Institute of Standards and Technology · Selected complete NIST AI 600-1 risk sections read: unsupported claims, overreliance, privacy and information integrity. No transcript, summary or generated-review accuracy rate certified.

    Business Analysis Academy, AI for analysts: only the exact selected evidence scope stated in notes; not binding global product requirements or validation of fictional examples. · Checked 2026-11-07

    July 2024. Actual read scope: Cover/intro; complete sections 2.2, 2.4, 2.6, 2.7, 2.8; selected action snippets only, not full section 3. Limits: No whole-document review or figure reuse claimed. No figure copied or integrated.

  2. Market practice

    The Business Analysis Standard ↗ — International Institute of Business Analysis · Existing canonical IIBA Standard record reused unchanged. Own selected public HTML sections 4.3/4.4 and landing overview read 7 November 2026: requirements/designs, classification and traceability. No own PDF edition or full BABOK 50-technique claim.

    IIBA's free statement of what business analysis is: the Business Analysis Core Concept Model and its six core concepts, the distinction between a requirement and a design, and the requirements classification schema. It names the six knowledge areas and the thirty tasks under them, and illustrates those tasks, while referring the reader to BABOK for their detail.

    Used here for the BA-technique questions a Payments Business Analyst and a Payments Product Manager are asked — at task level. The task list is the same thirty as BABOK v3, so a task-level claim is citable to it. Read update7November2026: Actual official Business Analysis Standard v2.0(2025) taskcards Assess Requirement and Design Changes printedp36 and Define Change Strategy p41 read7November2026: proposed impacts/recommendations, current-to-future options and transitions. No universal readiness template or full BABOK claimed read. · Checked 2026-08-25

    A free PDF of the same Standard (v2.0) is published at https://www.iiba.org/knowledgehub/the-business-analysis-standard.pdf. Re-checked 2026-08-25: the Knowledge Hub HTML URL above remains the live canonical page; do not replace it with a third-party mirror.

    What it does not carry: the technique catalogue. BABOK v3's 50 techniques live in BABOK v3 only, which is behind IIBA membership (ISBN 9781927584026). A question naming a technique needs the book, verified by a person holding it, or should be rewritten to ask about the task instead.

    And it does not carry the knowledge areas either. The Standard's own section 5.3 says it "intentionally does not include information on the knowledge areas defined in the Business Analysis Body of Knowledge", and refers the reader to BABOK for them. It names the six and links out to each, and it illustrates the 30 tasks, but the detail sits in BABOK. Cite this entry at task level, not at knowledge-area level.

    Current edition is v2.0, a 2025 refresh of roughly 60 pages. The often-quoted "June 2023, 110 pages" describes a different object — the print edition, ISBN 9781927584378, of the earlier text. Welding one object's version to another's date is the error this paragraph exists to prevent.

    Free to read is not open: the document is "All rights reserved". Cite and rewording; do not reproduce at length.

    One naming difference worth knowing when comparing against BABOK: the Standard calls knowledge area C "Requirements and Designs Life Cycle Management" where BABOK says "Requirements Life Cycle Management". Both forms were read on the page on the access date, the first in the Standard's own explore section and the second in the BABOK contents beside it.

    A dead address, corrected. The registered URL sat under /business-analysis-body-of-knowledge/, a path IIBA has retired; that path and its parent both answer HTTP 404. The Standard is published under /knowledgehub/ at the address above.

    The previous note said iiba.org could not be fetched, that roughly thirty candidate mirrors were each refused, and that nothing in the entry was a page-read of an IIBA document. That is withdrawn. The publisher's own page was read directly at HTTP 200 on the access date, and the claims above are checked against it. Read update7November2026: actual selected source scope above now inspected; previous broader/excerpt-only notes remain history and are not extended to unread sections.

  3. Market practice

    ISTQB Certified Tester Acceptance Testing (CT-AcT) syllabus ↗ — International Software Testing Qualifications Board (ISTQB) · ISTQB CT-AcT 1.0, 21 June 2019:selected complete 0.2, 1.1.2–1.1.3, 1.2.1–1.2.2 read. Criteria/test and requirement-quality distinctions; inherited source provenance not a new whole-syllabus claim.

    Version 1.0 syllabus (21 June 2019), read in full text. Used for the objective ids and levels, the modelling objectives in chapter 3, the four pillars of user experience requirements analysis in section 4.2.1 and the scope that leaves out operational acceptance testing. Paraphrased, not quoted. · Checked 2026-10-18

    Text read in full from a mirror copy of the publisher PDF (ISTQB syllabus CT-AcT v1.0, 21 June 2019), version checked against the document's own front matter. The page at this URL was not opened. Licence terms were not read, so put it in your own words and do not quote it.

    Specialist review 6 November 2026: Actual related substantive chapters 1–5 and Appendix text reviewed for Acceptance2019; not an assertion that every source figure was visually reviewed. Professional certification guidance, not binding legislation or a formal ISO standard. Inherited full-text descriptions are not a claim that this audit read every PDF page.

  4. Market practice

    INVEST in Good Stories, and SMART Tasks ↗ — Bill Wake · Bill Wake, 17 August 2003, complete substantive INVEST/SMART article read. Independent, negotiable, valuable, estimable, small, testable as a story heuristic, not universal requirements or a Scrum mandate.

    Business Analysis Academy, AI for analysts: exact original method/keyword convention scope, not universal format, quality or completeness requirements. · Checked 2026-11-07

    17 August 2003. Complete substantive INVEST/SMART article and origin discussion read. Original method-author heuristic, not a mandatory Scrum story format; example task sizes not adopted as rules. No figure copied or integrated.

  5. Official requirement

    The 2020 Scrum Guide ↗ — Ken Schwaber and Jeff Sutherland · Complete 2020 Scrum Guide substantive HTML read. Product Owner backlog accountability/delegation and framework scope; no mandatory As-a/Given-When-Then format or all-product legal liability rule.

    Business Analysis Academy, AI for analysts: only the exact read scope in notes; no universal organisational authority, job forecast or AI performance guarantee. · Checked 2026-11-07

    November 2020,authoritative HTML direct port. Actual read scope: Complete HTML substantive guide lines26–275, across initial and two overlapping bounded windows. Limits: Scrum scope, not universal organisational governance. CC BY-SA4.0 explicit; no new official figure identified or pixel reuse certified. No figure copied or integrated.

  6. Market practice

    ISTQB CTFL syllabus v 4.0.1 ↗ — International Software Testing Qualifications Board · ISTQB CTFL 4.0.1, 15 September 2024:selected 1.4.3–1.4.5, 4.2.2–4.2.3, 4.4.2, 5.2.3–5.2.4 read. Test-basis traceability, coverage and risk, not exhaustive correctness or a fixed quality-gate template.

    Certification curriculum guidance on traceability, partitions, boundaries, decision tables, state transitions, structural coverage and experience-based testing; not a universal product contract. · Checked 2026-11-06

    Version 4.0.1, 15 September 2024. Publisher PDF opened 6 November 2026. Paraphrased for teaching; no licence claim.

  7. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal · Junior-form analogy, Daily List, Lily Remind-me-nicely, eight criteria/three removed, text-message proposal and timely-versus-one-hour contrast are fictional. No supplied note3, user-set-time rule, live model output or approved additional criterion invented.

    This site's own simplified teaching models. · Checked 2026-07-12

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.