Prioritisation: cost of delay and WSJF

Rank work by what waiting costs. Learn cost of delay, the three parts of it, job size, and how Weighted Shortest Job First (WSJF) divides one by the other to order a backlog.

L1–L4 are part of the Pro pass

L0 Explain simply

Analogy: A leaking roof and a paint job. A leaking roof costs you more each day it waits, because the water spoils the floor. A paint job costs nothing extra if it waits a month. So you fix the roof first. The limit is that nobody knows the exact cost of the leak, so the cost is an estimate.

Daily List, the to-do list app, has a sharing bug. Each week it stays, about fifty users give up on sharing. Nina, the , sees that waiting has a price. The price of waiting is the , what you lose for each period an item waits.

Not every job has the same price for waiting. A small fix that saves many users is better to do first than a large change that saves a few.

So Sam, the , uses Weighted Shortest Job First (), a ranking by cost of delay divided by job size, which is a rough measure of how much work an item needs. A high cost of delay and a small size give the top rank.

Nina puts the sharing fix first, because waiting costs a lot and the fix is small.

The numbers are estimates. WSJF helps a team talk about order, and it does not give a final answer.

PICTURE IT

The picture is the one the lesson above opens with. The table below shows how each part of it matches the work.

THE REAL JOB The picture helps a team remember that waiting has a price and that small, costly-to-wait jobs go first.

  1. List items
  2. Score the cost of delay
  3. Size the job
  4. Divide
  5. Talk about the order
Ranking by waiting

HOW THE PICTURE MAPS

How each part of the picture matches the work
In the pictureIn the work
A leaking roofAn item with a high cost of delay
A paint job that can waitAn item with a low cost of delay
How big the repair isThe job size
Fixing the roof firstThe highest score goes first
A guess about the damageThe score is an estimate

WHERE THIS PICTURE STOPS

  • A roof leak is easy to see. Costs of delay in software are estimates.
  • A house has one owner. A product has users, owners and stakeholders who may disagree.
  • A roof is repaired once. A backlog is reordered again and again.

HOOK

What waiting costs, divided by how big the job is.

REMEMBER IT THIS WAY

A rule of thumb: if you see this, think that.

If waiting costs a lot and the job is small, do it first. Divide the by the to compare items.

What each part of the trick stands for
In the trickWhat it stands for
Costwhat you lose for each period an item waits
Sizehow big the repair is
Dividethe highest score goes first

Both numbers are estimates, so a close score is a talking point, not an answer.

TELL A FRIEND

is what you lose each period an item waits. Weighted Shortest Job First divides it by and puts the highest score first.

OFTEN MIXED UP WITH Prioritisation: Kano and value against effort. That topic sorts features by how users feel and by . This one adds the price of waiting and divides it by size.

PRACTISE AND KEEP

Sources for this topic — 2 sources
  1. Market practice

    WSJF primary practice guidance ↗ — framework.scaledagile.com · Current SAFe knowledge base, WSJF definition/publicDetailslead-in read6Nov2026; relative costdelay / relative duration, jobsizeapproximation and threecomponents, ignores sunkcosts. Details afterlogin notread. Archivedv4/v4.6 descriptions notcurrentrules. Cost-delaycurves/classes contextual, notuniversalconstantlossshape.

    Current SAFe knowledge base, WSJF definition/publicDetailslead-in read6Nov2026; relative costdelay / relative duration, jobsizeapproximation and threecomponents, ignores sunkcosts. Details afterlogin notread. Archivedv4/v4.6 descriptions notcurrentrules. Cost-delaycurves/classes contextual, notuniversalconstantlossshape. · Checked 2026-11-06

    Relevant public sections reviewed for the V11 BA agile/product audit. Scope and access limits are recorded in applicability. Educational practice guidance; no universal statutory requirement is asserted.

  2. Simplified educational illustration

    Payments Signal editorial teaching models — Payments Signal

    This site's own simplified teaching models. · Checked 2026-07-12

    What this simplifies: Daily List, its people, numbers and scenarios are invented educational examples. Local methods, counts, thresholds and templates are not universal obligations. Source versions and access limits are stated in the accompanying citations.

    Used wherever diagrams, scenarios, figures, or example values are didactic constructions rather than sourced facts; every such use carries a simplifications disclosure. All people, companies, banks, and list entries in examples are fictional.

Deepest material on this page: L4 — Standards & sources. Where a topic stops short of implementation depth, that is a deliberate coverage decision, not an oversight — see coverage.